Iron Rod Falls on Running Car at Zoo Road flyover construction September 14, 2022 Assam A 15-foot long iron rod reportedly fell on a sedan passing by below the Zoo Road flyover construction site in Guwahati on Sept 13 around 6 PM. The car was damaged and luckily all passengers escaped unharmed. Related Posts STF Raid in Bharalumukh Leads to Arrest of Drug Peddler A meticulously planned raid by Assam's Special Task Force (STF) in Bharalumukh resulted in the… Youth Missing After Fishing Trip on Siang River in Assam In Jonai, Assam, a youth named Bhuban Das (30) has gone missing while fishing in… Tezpur Road Construction: Review Meeting Sets Plan for RCC Bridge Under the leadership of District Commissioner Deba Kumar Mishra, a review meeting was held in…
STF Raid in Bharalumukh Leads to Arrest of Drug Peddler A meticulously planned raid by Assam's Special Task Force (STF) in Bharalumukh resulted in the…
Youth Missing After Fishing Trip on Siang River in Assam In Jonai, Assam, a youth named Bhuban Das (30) has gone missing while fishing in…
Tezpur Road Construction: Review Meeting Sets Plan for RCC Bridge Under the leadership of District Commissioner Deba Kumar Mishra, a review meeting was held in…